R4_FuelTransfer_1298e

 

  • Breakdown of transferred assemblies by kind
    Spent fuel   1276   assemblies/1,331 assemblies
    Unirradiated (New) fuel     22 assemblies/ 202 assemblies
  • Number of times of cask transportation:
    59 times

The fuel removal work was resumed on September 4, 2014, which had been suspended
since July 1, 2014 due to the annual inspection of ceiling crane.

*The radiation dose from new (unirradiated) fuel is small enough to handle by hand.